One of the first questions in any subdivision is what happens to the house that is already there. Many owners want to keep it and create one new lot beside or behind it. Others plan to clear the block and start again. Both can work, but each comes with its own rules.
This guide explains what a kept house has to do on its smaller lot, what happens to sheds, garages and pools, and which approvals are needed to demolish in each state.
Keeping the house
Can I keep my house and subdivide the block? Often you can. The house has to fit on its new lot and still meet the rules that apply to it there, such as setbacks to the new boundary, outdoor living area and car parking. Anything that would sit across the new boundary has to be altered or removed.
That is the core test in every state. A house that was compliant on a large lot can fall short once a new boundary is drawn close to it. Common pinch points are:
- the side or rear setback from the house to the new boundary
- the outdoor living area left for the house
- room for the car parking the rules require
- a driveway that has to pass the house to reach a rear lot
Does the existing house affect the layout of the new lots? Yes. Where the house sits on the block often decides whether the lots can sit side by side, front and rear with a battle-axe access leg, or not at all without removing part of the house. Our guide to battle-axe subdivision explains the rear lot option, and our corner block guide covers blocks with two street frontages.
How the states treat a kept house
Western Australia
The WA Planning Commission's Operational Policy 2.2 deals with an existing dwelling that is kept when the new lot is reached by a battle-axe leg or communal street. It says there should be no eaves overhangs or other protrusions into the driveway, and adequate space for the car parking required by the R-Codes. An October 2026 explanatory note proposes repealing Operational Policy 2.2 once the R-Codes review is complete, with its content moving into the R-Codes or a draft operational policy. That is a proposal only. The current policy still applies.
Separately, the WA Government is investigating Retain and Gain, a possible pathway to keep the existing house and create an additional lot on R10 to R25 land in Perth and Peel. It has not been approved; see our news on Retain and Gain.
Councils check these points when they clear the conditions of a WA subdivision approval. The Town of Victoria Park's clearance information sheet, for example, says buildings must have the necessary clearance from the new boundaries, and the existing dwelling being retained is to comply with the R-Codes. The City of Fremantle's July 2026 guide says a retained dwelling must comply with the R-Codes and have an outdoor living area with a minimum dimension of 4 m.
Tasmania
In the General Residential Zone, clause 8.6.1 of the State Planning Provisions sets the acceptable solution for lot design. Each lot must be not less than 450 m² and able to contain a building area of at least 10 m x 15 m with a gradient not steeper than 1 in 5, clear of setbacks. Existing buildings must be consistent with the setbacks required by the zone's development standards.
Other states
In Victoria, NSW, Queensland, South Australia, the ACT and the Northern Territory, the test is set by the local planning scheme, code or council plan, and the council or assessing authority checks it when it assesses the subdivision. Our state guides explain who assesses a subdivision in each state, and our guide to how to subdivide land in New South Wales notes that an existing house, shed or pool has to sit within one of the new lots.
Sheds, garages and pools
What happens to sheds and pools when I subdivide? They are treated like the house. Some WA councils require all buildings, outbuildings and structures, including swimming pools and concrete hardstand, to be demolished before clearance unless the approved plan shows them being kept. A pool that is kept still needs a compliant safety barrier.
The Town of Victoria Park's clearance sheet lists swimming pools and concrete hardstand among the structures to be removed unless they are shown for retention, and the City of Fremantle says it requires the subject lot to be cleared of all structures, including swimming pools.
For a pool that stays, the barrier rules still apply after the new boundary goes in:
- WA: pools with water over 300 mm deep must have a compliant safety barrier, and local governments inspect at least every four years, as the City of Cockburn explains.
- QLD: the Queensland Building and Construction Commission says pool barriers must be at least 1,200 mm high, and a dividing fence can act as the pool barrier if it is at least 1,200 mm high and non-climbable. Where only one neighbour has a pool, that owner must pay the full cost of compliance fencing.
A pool that ends up close to a new boundary fence is worth raising early with your surveyor and certifier.
Demolition approvals by state
Do I need approval to demolish a house? In most of Australia, yes. A demolition permit is needed in Western Australia under the Building Act 2011, Victoria requires a building permit, Brisbane City Council says building approval is needed in Brisbane, and the ACT requires building approval. NSW allows some demolition as complying development under the Demolition Code.
- WA: a demolition permit is issued by the local government's building services. Removing more than 10 m² of asbestos as a business needs an asbestos removal licence from WorkSafe WA.
- VIC: a building permit to demolish needs the council's report and consent under section 29A of the Building Act 1993 where the demolition is more than half the volume of the building, or it would demolish any part of a street-facing facade that is at least partly visible from the street. The council has 15 business days to respond.
- NSW: demolition may be done as complying development if it meets the Demolition Code standards in Part 7 of the Codes SEPP. Neighbours must be notified before work starts. For buildings built before 1987, asbestos must be handled and removed by a licensed contractor.
- QLD: Brisbane City Council says you need building approval from a licensed private building certifier before demolition work, and planning approval may also be needed, for example under its character or heritage overlays.
- SA: demolition of a State or local heritage place, or in a Historic Area Overlay, needs approval under the Planning and Design Code, which applies demolition control in those areas.
- TAS: demolishing a detached dwelling is notifiable building work lodged through a building surveyor, while low-risk work such as removing a garage or shed needs no building permit, although planning approval may still be needed.
- ACT: demolition requires building approval, with a licensed building surveyor appointed as certifier.
- NT: a building permit sets conditions on the demolition of a building, and permits are required in the NT's building control areas.
Heritage changes the picture
If the house is in a heritage area, demolition is usually its own planning question. In Victoria the Heritage Overlay requires a permit to demolish or remove a building, including part of a building or a fence, and the council must refuse consent to a demolition building permit until any required planning permit has been obtained. In South Australia, local heritage places and the Historic Area Overlay carry demolition control. Our heritage and subdivision guide covers this in more detail.
Getting advice
A licensed surveyor can show where a new boundary would fall in relation to the house, sheds and pool. A town planner can confirm the setback, open space and parking rules that apply to a kept house in your zone.
If you would like a first look at the design options for your own address, including what is in the way, you can check your block with Subdivision Checker.
Sources
- Operational Policy 2.2 Residential Subdivision, 31 May 2024 (WA Planning Commission)
- Explanatory note: review of Operational Policy 2.2 Residential Subdivision, October 2026 (WA Government)
- Subdivision clearance information sheet (Town of Victoria Park)
- Subdivision conditional approval, July 2026 (City of Fremantle)
- Demolition permit (City of Cockburn)
- Swimming pools and spas (City of Cockburn)
- Demolition of buildings (Building and Plumbing Commission, Victoria)
- Heritage Overlay controls (Glen Eira City Council)
- Demolition, complying development (NSW Planning Portal)
- Demolition (Brisbane City Council)
- Pool fences (Queensland Building and Construction Commission)
- Heritage and character (PlanSA)
- State Planning Provisions, 10 May 2023 (Tasmanian Planning Commission)
- Categories of building work (CBOS Tasmania)
- Building approvals (ACT Planning)
- Work that requires permits (NT Government)
This guide is general information only. For advice on your property, speak with a licensed surveyor or town planner in your state.