In the City of Moreton Bay, subdivision is called reconfiguring a lot, and the rules come from the MBRC Planning Scheme. Council says reconfiguring a lot "is generally assessable development", so in most cases you need a development approval from council. Your zone and precinct set the lot size or density, the scheme's Reconfiguring a lot code sets the detailed requirements, and overlays such as flood, coastal hazard and bushfire can add more.
The council was Moreton Bay Regional Council until 2023, when a state regulation renamed it Moreton Bay City Council and reclassified the area as a city. It now calls itself the City of Moreton Bay, but its planning scheme keeps the MBRC name. In several Moreton Bay zones and precincts, lot yield is controlled by density (lots per hectare) rather than a single minimum lot size. This guide sets out the local rules. Figures are as at November 2026.
Which version of the planning scheme applies
The MBRC Planning Scheme was adopted on 24 November 2015 and commenced on 1 February 2016. Council says its most recently adopted amendments "commenced on 2 November 2026, creating version 9 of the planning scheme". Those were:
- Major Amendment No. 4 (Morayfield South Emerging Community Area and Designated Bushfire Prone Areas), adopted at council's General Meeting on 28 October 2026. Council describes it as incorporating the updated Morayfield South Structure Plan into the scheme and removing certain exclusions, so that particular types of new buildings in all areas mapped as Bushfire Prone Areas must meet bushfire building requirements.
- Minor Amendment No. 4, a consequential amendment to Major Amendment No. 4 and to the scheme's accepted development table.
Version 8 commenced on 11 September 2026 with the Local Government Infrastructure Plan (LGIP) Amendment No. 2. Before that, the Better Housing Amendment took effect on 30 October 2024. Council says it introduced "requirements for more green space, larger yards" in the Next generation neighbourhood precinct, along with changes to secondary dwellings and parking.
The scheme is published as an eScheme, which you can browse online and download in parts. Inside it, the rules you need are:
- Part 5.6, which sets the category of assessment for reconfiguring a lot in each zone.
- The Reconfiguring a lot code (section 9.4.1), which holds most of the requirements. The General residential zone provisions are at section 9.4.1.6.
- Planning Scheme Policy – Neighbourhood design (schedule 6), which council says helps with applying the density provisions.
A new planning scheme is on the way, but not in force
Council resolved on 28 January 2026 to replace the scheme, which it calls the Moreton Bay Regional Council Planning Scheme 2016, now 10 years old. Early consultation ran from 1 June to 12 July 2026, with targeted consultation from 18 July to 8 August 2026. Council's project page says key findings are due to be reported back in November 2026, and that it expects statutory consultation on a draft scheme "to occur in 2028". No adoption date has been set.
Council's January 2026 media release says the current planning scheme will remain in place until the new scheme is approved. Until then, the MBRC Planning Scheme's rules apply.
How to find your zone and precinct
Council's reconfiguring a lot information sheet points to its My property look up and Interactive map tools to find the zone, precinct and overlays for a property. Check the precinct as well as the zone, because the General residential zone has four precincts with very different rules. Some suburbs are also covered by a local plan, such as Caboolture West or Redcliffe Kippa-Ring, which has its own precincts.
General residential zone
Council's General residential zone information sheet describes the zone's four precincts:
| Precinct | Intended housing | Density and height |
|---|---|---|
| Suburban neighbourhood | "Houses on traditional residential lots as well as houses on narrow lots subject to locational and design requirements" | No greater than 15 dwellings per hectare, up to 8.5 m |
| Coastal communities | "Houses on traditional size residential lots" | No greater than 15 dwellings per hectare, up to 8.5 m |
| Next generation neighbourhood | "Houses on a variety of lot sizes including traditional and narrow lots" | 15 to 75 dwellings per hectare, generally up to 12 m |
| Urban neighbourhood | Medium and high density housing, including apartments and terraces | At least 45 dwellings per hectare, or 75 in particular localities |
For reconfiguring a lot, council's information sheet lists:
- Suburban neighbourhood and Coastal communities precincts: 600 m² minimum lot size (maximum density 11 lots per hectare) and a 12.5 m minimum frontage.
- Next generation neighbourhood precinct: no minimum lot size listed. Instead, a net residential density of at least 11 and no more than 25 lots per hectare applies.
- Urban neighbourhood precinct: no lot density prescribed, but the ultimate development must achieve at least 75 dwellings per hectare in certain areas near Redcliffe Peninsula Line stations and 45 dwellings per hectare elsewhere.
Council says the lot sizes and frontages in its table are "mostly examples", and that an alternative must meet the code's performance outcomes. It also says the densities, lot sizes and frontages are a summary "and should be used as a preliminary guide only". Council adds that the number of lots you can create depends on several factors, including lot size and design, site density, mix and location, and values and constraints.
One more rule matters for established suburbs. Council says: "Where a property is already at the minimum lot size or density, the further subdivision of the property may not be supported."
For rear lots, see battle-axe subdivision explained. To compare Moreton Bay with Brisbane and Logan, see the minimum lot size for subdivision in Queensland.
Other zones and local plans
Council's information sheet also lists, among others:
- Rural residential zone: the minimum depends on the Overlay map – Rural residential lot sizes, which has four categories: 2 ha, 6,000 m², 3,000 m² or no further reconfiguration.
- Rural zone: 100 ha minimum and a 100 m frontage, with exceptions in the Reconfiguring a lot code.
- Township zone, Township residential precinct: a maximum of 11 lots per hectare.
- Emerging community zone, Transition precinct (developed lots): 11 to 25 lots per hectare, with a minimum of 45 lots per hectare in the Morayfield South urban area.
- Caboolture West local plan, Urban living precinct (developed lots): 11 to 30 lots per hectare, as set by the Neighbourhood development plan.
Where subdivision is not supported
Council's information sheet says subdivision is not supported in:
- the Limited development zone
- the Emerging community zone, Interim precinct
- the Emerging community zone, Transition precinct (creating developable lots)
- the Caboolture West local plan "where no Neighbourhood development plan is approved by Council and included in the Local plan"
- the Redcliffe Kippa-Ring Local Plan, Interim residential precinct.
The regional plan also applies. Council says a proposal to subdivide land in the Regional Landscape and Rural Production Area into lots under 100 hectares "is prohibited unless the allotment is affected by a road severance", with some exemptions for boundary realignments and lot amalgamations. Council's sheet still names the South East Queensland Regional Plan 2009–2031; the Queensland Government now refers to the regional plan as ShapingSEQ. See how to subdivide land in Queensland for the state rules.
Flood, coastal hazard and bushfire
Council's reconfiguring a lot sheet says that if your property is on the Coastal hazard or Flood hazard overlay maps "and located within the erosion prone area or a high or medium risk area, additional requirements will apply which may restrict the ability to subdivide the property."
- Flood hazard overlay. Council's information sheet says the High and Medium risk areas were mapped by considering "the depth and velocity of water" and how often flooding occurs. The Balance flood planning area covers all land outside the High and Medium risk areas. Council notes that its Flood Check property reports map the frequency and depth of floods but "do not map risks associated with development", so they cannot be compared directly with the overlay.
- Bushfire hazard overlay. Council lists reconfiguring a lot among the development the overlay applies to. Its safety requirements include a "Minimum 20 metre separation from classified vegetation", a minimum 4 m wide access path suitable for a standard fire-fighting appliance, and an adequate water supply for fire-fighting. Major Amendment No. 4, in force from 2 November 2026, covers designated bushfire prone areas, so check the current mapping for your lot.
An overlay does not rule a subdivision out on its own, but it can limit where boundaries and building areas go.
How the application works
Council is the assessment manager for a typical residential subdivision. Amalgamating lots does not need council approval, and council says a surveyor can lodge that plan directly with the Queensland Titles Registry. For the state process, timeframes and appeal rights, see how to subdivide land in Queensland.
Infrastructure charges, water and sewer
Council levies infrastructure charges for transport, public parks and land for community facilities, and stormwater. Its infrastructure charges page names the Moreton Bay Regional Council Charges Resolution (No. 10), which applies to development approvals given on and from 5 October 2022, and offers an IC spreadsheet calculator. Council says levied charges are indexed up to the date of payment, capped at the maximum charge at the time of payment, and that payment can only be accepted after council issues an infrastructure charges fee statement.
Unitywater is responsible for connections to the water and sewerage networks. It says that if you subdivide, "you need approval to add additional connection points to our water and wastewater network": a Connection Approval, plus a Network Works Approval if mains need to be extended or upgraded. Your registered certifier lodges these applications, and infrastructure charges are payable as part of the process. For an overall estimate, try our subdivision cost calculator.
Plan endorsement and titles
Once the works and conditions are done, your surveyor's plan goes to council for endorsement (often called plan sealing). Council says the application must include its Plan endorsement application form, a conditions compliance report, supporting documents and fees "as per Council's current adopted fees and charges". A Unitywater Certificate of completion must also be submitted. Council has 20 business days to decide, counted from when it has received all outstanding items. An accelerated pathway is available for condition-compliant applications certified by an accredited consultant. The endorsed plan is then lodged with the Queensland Titles Registry for the new titles.
Contacting the City of Moreton Bay
Council can be reached on (07) 3205 0555 or 1300 477 161, by email at council@moretonbay.qld.gov.au, or by post at PO Box 159, Caboolture Qld 4510. Water and sewer connection questions go to Unitywater.
Check your own block
A Subdivision Checker report applies these rules to one address: planning and zoning, heritage, environment, contamination, bushfire, flood, servicing and access, measured lot geometry and concept subdivision design options, plus indicative cost ranges labelled as estimates. It is a starting point, not a substitute for advice from a licensed surveyor or town planner. To see how the checks are set out, view our sample report, or order a report for your address.
Frequently asked questions
What is the minimum lot size for subdivision in Moreton Bay?
It depends on the zone and precinct under the MBRC Planning Scheme. Council's reconfiguring a lot information sheet lists 600 m² (maximum density 11 lots per hectare) with a 12.5 m frontage in the Suburban neighbourhood and Coastal communities precincts of the General residential zone. The Next generation neighbourhood precinct has no lot size listed but a net residential density of 11 to 25 lots per hectare. Council says these figures are a preliminary guide only.
Can I subdivide in Moreton Bay?
It is not ruled out, but it depends on your zone and precinct, the lot size, frontage and density rules in the Reconfiguring a lot code, and overlays such as flood, coastal hazard and bushfire. Council lists some areas where subdivision is not supported, and says land already at the minimum lot size or density may not be supported for further subdivision. A licensed surveyor or town planner can advise on a specific lot.
Which planning scheme applies in Moreton Bay?
The MBRC Planning Scheme, which commenced on 1 February 2016. Council says the latest amendments commenced on 2 November 2026, creating version 9. Council resolved in January 2026 to replace the scheme, but the new scheme is not in force, and council expects statutory consultation on a draft in 2028.
Where is subdivision not supported in Moreton Bay?
Council's information sheet lists the Limited development zone, the Emerging community zone Interim precinct, the Emerging community zone Transition precinct (creating developable lots), the Caboolture West local plan where no Neighbourhood development plan is approved and included in the local plan, and the Redcliffe Kippa-Ring Local Plan Interim residential precinct.
Does the flood overlay stop subdivision in Moreton Bay?
Not automatically. Council says that if a property is on the Flood hazard or Coastal hazard overlay maps and within the erosion prone area or a High or Medium risk area, additional requirements will apply which may restrict the ability to subdivide. The flood overlay has High risk, Medium risk and Balance flood planning areas. A town planner can explain how the overlay code affects a layout on your lot.
How long does plan endorsement take in Moreton Bay?
Council says it has 20 business days to decide a survey plan endorsement application, counted from when it receives all outstanding items. The application needs council's Plan endorsement application form, a conditions compliance report, fees, and a Unitywater Certificate of completion.
Sources
- MBRC Planning Scheme – Reconfiguring a lot information sheet (City of Moreton Bay)
- MBRC Planning Scheme (City of Moreton Bay)
- Planning scheme document (City of Moreton Bay)
- View our planning scheme online (City of Moreton Bay)
- Planning Scheme Amendments (City of Moreton Bay)
- Better Housing Amendment (City of Moreton Bay Your Say)
- City of Moreton Bay begins new planning scheme chapter (media release, 29 January 2026)
- New planning scheme (City of Moreton Bay Your Say)
- MBRC Planning Scheme – General residential zone information sheet (City of Moreton Bay)
- MBRC Planning Scheme – Flood hazard overlay information sheet (City of Moreton Bay)
- Bushfire hazard overlay information sheet (City of Moreton Bay)
- ShapingSEQ FAQs (Queensland Government)
- Infrastructure charges (City of Moreton Bay)
- Subdivisions (Unitywater)
- Endorsement of subdivision plans (City of Moreton Bay)
- Local Government (Moreton Bay City Council) and Other Legislation Amendment Regulation 2023 (Qld)
- Contact Council (City of Moreton Bay)
This guide is general information only, current at November 2026. Rules, fees and maps change, and every block is different. Speak to a licensed surveyor or town planner about your property.