Subdivision cost in Sydney and NSW: the 2026-27 government fees

The main published state, council, titles and Sydney Water fees for a small Torrens subdivision in Greater Sydney in 2026-27, added up for a two-lot and a three-lot split, plus the costs that are quoted or set by your council's plan.

Updated 8 min read

Want the answer for your address? Your report checks the zoning, lot size, constraints and costs for your block, in your inbox within 1–2 hours.

Check my block

In NSW, the development application fee is set statewide, but your council sets its own subdivision certificate fee and contributions, and in Greater Sydney and three other regions the state charges a Housing and Productivity Contribution on each new lot. This guide sets out the published fees for a small Torrens subdivision in Greater Sydney for 2026-27 and adds them up for a two-lot and a three-lot split. Outside Greater Sydney some amounts differ, so check your council's own fees and charges.

For a two-lot split with no new road in Greater Sydney, the published fees come to $16,496.21, using Penrith City Council's subdivision certificate fee as the council example. Most of that is the Housing and Productivity Contribution of $13,522.84 for the one new lot. Local contributions under your council's plan, Sydney Water's infrastructure contributions and all the quoted work are on top of this.

The published fees, step by step

1. Development application

The fee for a development application is set by the Environmental Planning and Assessment Regulation 2021, and the Department of Planning, Housing and Infrastructure publishes the dollar amounts for 2026/27. For a subdivision other than strata that does not open a public road, it is $458 plus $53 for each additional lot created by the subdivision. If the subdivision opens a public road it is $921 plus $65 for each additional lot, and a strata subdivision is $458 plus $65 for each additional lot.

If your council's community participation plan requires the application to be notified, a further fee of $1,532 applies. Not every small subdivision is notified, so it is not in the total below.

2. Housing and Productivity Contribution

In Greater Sydney, the Central Coast, Illawarra-Shoalhaven and the Lower Hunter and Greater Newcastle, the state charges a Housing and Productivity Contribution on new residential, commercial and industrial development. For residential subdivision other than strata, it is charged per new dwelling lot. As at 1 October 2026 the rate is $13,522.84 per new dwelling lot in Greater Sydney and $9,015.23 in the Central Coast, Illawarra-Shoalhaven and Lower Hunter regions. The rates are indexed quarterly.

The department's worked examples give a credit for the existing lot, so a one-into-two Torrens split pays for one lot. Strata subdivision does not attract the contribution. Some areas also carry extra transport or biodiversity components. Your council or certifier works out the amount for your application.

3. Subdivision certificate

Once the conditions of consent are met, your surveyor's plan goes back to council, or in some cases a registered certifier, for a subdivision certificate. Each council sets this fee. Two 2026-27 examples:

  • Penrith City Council charges $857 plus $65 for each additional lot created, so $922 for a two-lot split.
  • Sutherland Shire Council charges a base fee plus $425 per lot.

The application is lodged on the NSW Planning Portal, which charges a $47 submission fee for a subdivision certificate in 2026/27.

4. NSW Land Registry Services

The certified plan is then lodged with NSW Land Registry Services, which registers it and creates the new titles. From 1 July 2026 it charges $384.78 including GST to lodge a deposited plan, plus $384.78 for each lot after the first. If the plan creates an easement or restriction, such as a right of carriageway for a battle-axe lot, the section 88B instrument adds $182.71 for each easement or restriction it creates.

5. Sydney Water

In Sydney Water's area, your council or certifier will tell you if you need a Section 73 compliance certificate, usually as a condition to meet before the subdivision certificate. Sydney Water needs your development consent before it can issue one. The development requirements application is $723.81 in 2026-27 ($273.70 for complying development).

What the fees add up to

The table below adds up the published fees for a split of one Greater Sydney lot into two and into three lots, with no new road. It uses Penrith's subdivision certificate fee as the council example and assumes the Housing and Productivity Contribution is charged on the extra lots only, after the credit for the existing lot. It leaves out local contributions, Sydney Water's infrastructure contributions and everything that is quoted.

Fee (2026-27) Two lots Three lots
Development application ($458 + $53 per additional lot) $511.00 $564.00
Housing and Productivity Contribution, Greater Sydney ($13,522.84 per extra lot) $13,522.84 $27,045.68
Subdivision certificate, Penrith example ($857 + $65 per additional lot) $922.00 $987.00
NSW Planning Portal submission $47.00 $47.00
NSW LRS deposited plan ($384.78 + $384.78 per lot after the first) $769.56 $1,154.34
Sydney Water development requirements application $723.81 $723.81
Total published fees $16,496.21 $30,521.83

The Housing and Productivity Contribution is by far the largest published item, so each extra lot adds most to the total. Outside its four regions it does not apply, and your council's own certificate fee replaces the Penrith example. To run the numbers for a different number of lots or region, use our subdivision cost calculator.

Costs that are not in the total

Local contributions. Most councils charge a section 7.11 contribution or a section 7.12 levy under their contributions plan. The amount depends on the plan that covers your land and can be one of the largest costs. It is set in your conditions of consent.

Sydney Water infrastructure contributions. Since 1 July 2026, Sydney Water charges infrastructure contributions for drinking water and wastewater at full prices in its development servicing plan areas. They are set per equivalent tenement, roughly the demand of one detached house, cover only the extra demand your development adds, are indexed to CPI on 1 July each year, and are charged at the rate current when you are ready to connect. A credit can apply for existing use. Sydney Water's own worked example shows a dual occupancy (one house to two) on a 650 m² lot paying $2,948.37 at its example prices. A simple one-into-two split in the Malabar wastewater area works out at about $2,950 to $4,340 at those prices, depending on lot size: about $4,340 where the original lot is larger than about 670 m², and about $2,950 for a smaller lot, as in Sydney Water's 650 m² example. That is our estimate, not a Sydney Water figure: your area's prices and the current year's indexation decide the real amount. You will also pay a Water Servicing Coordinator and for any new pipes. Outside Sydney Water's area, such as Hunter Water's area or where council is the water authority, the charges differ.

Subdivision works certificate. If the subdivision needs works such as a driveway, drainage or services, they need a subdivision works certificate and inspections. Penrith quotes these case by case. Sutherland Shire charges $1,000 plus $500 per lot for a small subdivision of up to three lots when council is appointed as the principal certifier, with inspections charged on top.

Quoted work. These have no official figure and are priced on your site:

  • the registered surveyor's survey and plan of subdivision
  • a town planner's statement of environmental effects, if the application needs one
  • specialist reports such as bush fire, flood, arborist or heritage
  • civil works, driveways and stormwater
  • water, sewer, power and telecommunications connections
  • demolition or relocation of buildings that sit across the new boundary
  • conveyancing or legal work for easements and restrictions

Rules that come first

Whether your block can be split at all depends first on its zone, minimum lot size and constraints such as bush fire, flood and heritage. Our NSW minimum lot size guide covers the lot size maps, and our guide to subdividing in NSW walks through the state process. For two Sydney councils in detail, see our guides to Blacktown and The Hills. For timeframes, see how long subdivision takes, and for how costs compare across Australia, see how much it costs to subdivide in Australia.

A registered surveyor or town planner can confirm what your subdivision will involve and quote the work.

Frequently asked questions

How much does it cost to subdivide a block into two lots in Sydney?

For a two-lot Torrens split with no new road in Greater Sydney, the published 2026-27 fees add up to $16,496.21, using Penrith City Council's subdivision certificate fee as the council example. Most of that is the state Housing and Productivity Contribution of $13,522.84 for the one new lot. Local section 7.11 or 7.12 contributions, Sydney Water's infrastructure contributions, surveying, reports and works are on top of this.

What is the DA fee to subdivide land in NSW in 2026-27?

For a subdivision other than strata that does not open a public road, the 2026/27 development application fee is $458 plus $53 for each additional lot created. If the subdivision opens a public road it is $921 plus $65 for each additional lot, and a strata subdivision is $458 plus $65 for each additional lot.

Does the Housing and Productivity Contribution apply to a two-lot subdivision?

In Greater Sydney, the Central Coast, Illawarra-Shoalhaven and the Lower Hunter and Greater Newcastle, the Housing and Productivity Contribution applies to residential subdivision other than strata, per new dwelling lot. A credit is given for the existing lot, so a one-into-two Torrens split pays for one lot: $13,522.84 in Greater Sydney as at 1 October 2026. The rates are indexed quarterly.

How much does NSW Land Registry Services charge to register a plan of subdivision?

From 1 July 2026, NSW Land Registry Services charges $384.78 including GST to lodge a deposited plan, plus $384.78 for each lot after the first, so $769.56 for a two-lot plan. A section 88B instrument adds $182.71 for each easement or restriction it creates.

What does Sydney Water charge for a subdivision?

A development requirements application to Sydney Water is $723.81 in 2026-27 ($273.70 for complying development). From 1 July 2026 Sydney Water also charges infrastructure contributions for drinking water and wastewater at full prices in its development servicing plan areas, on the extra demand only. At the example prices in Sydney Water's worked examples, a one-into-two split in the Malabar wastewater area works out at about $2,950 to $4,340 depending on lot size (our estimate).

Sources

This guide is general information only, current at 18 November 2026. Fees and charges change, usually on 1 July, and the Housing and Productivity Contribution is indexed quarterly. Speak to a registered surveyor or town planner about your property.