In Queensland, subdivision is called reconfiguring a lot, and each council sets its own fees and infrastructure charges. This guide sets out the published fees for a small subdivision in Brisbane for 2026-27 and adds them up for a two-lot and a three-lot split. If your block is in another council area, the steps are similar but the amounts differ, so check your council's own fee schedule and charges resolution.
For a two-lot split in Brisbane, council's application and plan sealing fees, Titles Queensland's fees and council's infrastructure charge come to $25,551.27, if the infrastructure charge is levied on the one extra lot after the credit for the existing lot. Urban Utilities' water and sewerage charges, $18,335.20 per lot combined on its published schedule, and all the quoted work are on top of this.
The published fees, step by step
1. Council application to reconfigure a lot
Brisbane City Council's 2026-27 fees are set in points, at $150 a point. The base fee to reconfigure a lot is $4,500, which includes up to two lots, plus $900 for each additional lot from 3 to 30 lots. Council's fees do not include GST, except where indicated.
2. Infrastructure charge
Under the Brisbane Infrastructure Charges Resolution (No. 15) 2026, which has effect from 1 July 2026, council's adopted charge for reconfiguring a lot is $18,793.33 per lot. This is council's charge only: Urban Utilities levies its own charges for water supply and sewerage separately (see below). A credit applies for the demand of each existing lot, and the charge cannot be less than zero.
Council's charges cover transport, parks, land for community facilities and stormwater. Council gives you an infrastructure charges notice with your development approval, and for reconfiguring a lot the charge is payable when council approves the plan of reconfiguration.
3. Plan sealing
Once the conditions are met, your surveyor's plan is lodged with council for approval, known as plan sealing. The 2026-27 fee is $600 per request plus $450 per lot on the survey plan.
4. Titles Queensland
The sealed plan is then lodged with Titles Queensland, which registers it and issues the new titles. Its FY2026/27 fees are $496.12 per plan plus $36.49 per lot or interest to lodge the plan, and $94.42 per new title. A title search before you start is $25.71.
What the fees add up to
The table below adds up the published fees for a split of one Brisbane lot into two and into three lots. It assumes the infrastructure charge is levied on the extra lots only, after the credit for the existing lot. It leaves out Urban Utilities' charges and everything that is quoted.
| Fee (2026-27) | Two lots | Three lots |
|---|---|---|
| Council reconfiguring a lot ($4,500 up to 2 lots, then $900 per lot) | $4,500.00 | $5,400.00 |
| Council infrastructure charge ($18,793.33 per extra lot) | $18,793.33 | $37,586.66 |
| Council plan sealing ($600 + $450 per lot) | $1,500.00 | $1,950.00 |
| Titles Queensland plan lodgement ($496.12 + $36.49 per lot) | $569.10 | $605.59 |
| Titles Queensland new titles ($94.42 per title) | $188.84 | $283.26 |
| Total published fees | $25,551.27 | $45,825.51 |
The infrastructure charge is by far the largest published item, so each extra lot adds most to the total. To run the numbers for a different number of lots, use our subdivision cost calculator.
Costs that are not in the total
Water and sewerage. In Brisbane, Urban Utilities levies its own infrastructure charges for water supply and sewerage, separately from council's charge. Its Water Netserv Plan (Part A) sets an adopted charge for reconfiguring a lot in Brisbane of $6,050.50 for water supply and $12,284.70 for sewerage per lot, or $18,335.20 per lot combined. A credit can apply for existing demand on the network, such as a house already connected, but you may need to apply for it with evidence and pay a fee. Charges are indexed from the date of the charges notice, so the amount payable may be higher. If the credit covers the existing lot, a two-lot split would pay these charges on one extra lot. They are not in the table above: confirm the figure for your block with Urban Utilities. Its Standard Connection Guidelines say a Water Approval is typically required where a development approval is needed for reconfiguration, and that all fees and charges are payable before construction works commence.
Quoted work. These have no official figure and are priced on your site:
- the licensed surveyor's survey and plan of subdivision
- a town planner's report, if the application needs one
- specialist reports such as flood, geotechnical or heritage
- civil works, which in Queensland often need a separate operational works approval with its own fees
- water, sewer, stormwater, power and telecommunications connections
- demolition or relocation of buildings that sit across the new boundary, and driveways
- conveyancing or legal work
Council's fee schedule also lists compliance and inspection fees and fees for other applications. Which of these apply depends on your approval and its conditions.
Rules that come first
Whether your block can be split at all depends first on its zone, area and overlays. Our Brisbane subdivision guide covers City Plan 2014 lot sizes, the new 120 m² lots (subject to design criteria), character and flood overlays, and plan sealing. Our QLD minimum lot size guide compares councils, and our guide to subdividing in Queensland walks through the state process. For nearby councils, see our guides to Gold Coast, Moreton Bay and Logan. For how costs compare across Australia, see how much it costs to subdivide in Australia.
A licensed surveyor or town planner can confirm what your subdivision will involve and quote the work.
Frequently asked questions
How much does it cost to subdivide a block into two lots in Brisbane?
Brisbane City Council's application and plan sealing fees, Titles Queensland's lodgement and new title fees, and council's infrastructure charge add up to $25,551.27 for a two-lot split in 2026-27, if the infrastructure charge is levied on the one extra lot after the credit for the existing lot. Urban Utilities' water and sewerage charges, surveying, planning reports and works are on top of this.
What is Brisbane City Council's reconfiguring a lot fee in 2026-27?
For 2026-27, Brisbane City Council's base fee to reconfigure a lot is $4,500, which includes up to two lots, plus $900 for each additional lot from 3 to 30 lots. Council's fees do not include GST, except where indicated.
What is Brisbane's infrastructure charge for a subdivision?
Under the Brisbane Infrastructure Charges Resolution (No. 15) 2026, which has effect from 1 July 2026, council's adopted charge for reconfiguring a lot is $18,793.33 per lot, and a credit applies for the demand of each existing lot. This is council's share only: Urban Utilities levies its own charges for water supply and sewerage separately.
How much is plan sealing in Brisbane?
Brisbane City Council's 2026-27 fee to approve a plan of subdivision (plan sealing) is $600 per request plus $450 per lot on the survey plan.
How much are Urban Utilities' water and sewerage charges for a subdivision in Brisbane?
Urban Utilities' Water Netserv Plan (Part A) sets an adopted charge for reconfiguring a lot in Brisbane of $6,050.50 for water supply and $12,284.70 for sewerage per lot, or $18,335.20 per lot combined. A credit can apply for existing demand on the network, such as a house already connected, if you apply for it (you may need to give evidence). Charges are indexed, so the amount payable may be higher.
Sources
- Development Assessment and Compliance Fees 2026–27 (Brisbane City Council)
- Brisbane Infrastructure Charges Resolution (No. 15) 2026
- Infrastructure charges (Brisbane City Council)
- FY2026/27 Fees (Queensland Titles Registry)
- Water Netserv Plan (Part A), Version 10 (Urban Utilities)
- Standard Connection Guidelines (Urban Utilities, STD166, January 2025)
This guide is general information only, current at 17 November 2026. Fees and charges change, usually on 1 July. Speak to a licensed surveyor or town planner about your property.