In Victoria, the planning permit, certification and titles fees are set statewide by regulation, but your water corporation sets its own contributions and your council decides whether a public open space contribution applies. This guide sets out the published fees for a small subdivision in Melbourne and the rest of Victoria for 2026-27 and adds them up for a two-lot and a three-lot split.
For a two-lot split, the published state fees come to $1,607.40 through VicSmart or $2,911.30 through the regular permit process. Your water corporation's new customer contributions on the new lot, about $1,830 to $3,460 for water and sewer at 2026-27 rates in established Melbourne, and all the quoted work are on top of this.
The published fees, step by step
Victorian statutory fees are set in fee units. For 2026-27 the fee unit is $17.27, applying from 1 July 2026. GST does not apply to statutory fees.
1. Planning permit or VicSmart application
Under the Planning and Environment (Fees) Regulations 2016, the 2026-27 fee for a permit to subdivide land into two lots is $1,537.00 (89 fee units). Other subdivisions are $1,537.00 for each 100 lots created, so a three-lot split pays the same $1,537.00.
Since 16 October 2025 more two-lot subdivisions can go through VicSmart, where the fee is $233.10 and the council has 10 business days to decide instead of 60 days. Land in a bushfire prone area, an Environmental Audit Overlay or a Neighbourhood Character Overlay is excluded, and a permit that would breach a registered restrictive covenant is not a VicSmart application. Your council confirms which pathway applies.
2. Certification of the plan
Once the permit is issued, your surveyor's plan of subdivision goes to council for certification, and later for a statement of compliance once the permit conditions are met. Under the Subdivision (Fees) Regulations 2016 the 2026-27 fee for certification of a plan of subdivision is $203.80.
3. Land Services Victoria registration
The certified plan is then lodged with Land Services Victoria, which registers it and issues the new titles. From 1 July 2026 the fee to register a plan of subdivision is $723.30 plus $223.60 for each parcel, so $1,170.50 for a plan creating two lots. If a mortgage, caveat or lease needs a notice for consent, a further $114.80 applies for each one. A parcel is each lot, road, reserve and common property created in the plan. Land registry fees are under review, and the current regulations run to 17 April 2027.
What the fees add up to
The table below adds up the published state fees for a split of one Victorian lot into two and into three lots. It leaves out water corporation contributions, open space, engineering fees and everything that is quoted.
| Fee (2026-27) | Two lots, VicSmart | Two lots, regular permit | Three lots |
|---|---|---|---|
| Planning permit or VicSmart application | $233.10 | $1,537.00 | $1,537.00 |
| Certification of the plan of subdivision | $203.80 | $203.80 | $203.80 |
| Land Services Victoria registration ($723.30 + $223.60 per parcel) | $1,170.50 | $1,170.50 | $1,394.10 |
| Total published state fees | $1,607.40 | $2,911.30 | $3,134.90 |
Victoria has no statewide infrastructure charge per new lot in established areas, so the state fees stay low. The larger costs come from water contributions, open space where it applies, and the surveyor and works. To run the numbers for a different number of lots, use our subdivision cost calculator.
Water corporation contributions
In Melbourne, your water corporation charges a new customer contribution for each new lot, for water and for sewer. The 2026-27 rates per lot in established areas are:
| Water corporation (2026-27) | Water | Sewer | One new lot, water and sewer |
|---|---|---|---|
| Yarra Valley Water, standard region | $1,113.63 | $1,113.63 | $2,227.26 |
| South East Water, other areas | $1,112.49 | $1,112.49 | $2,224.98 |
| Greater Western Water, former Western Water area (infill) | $1,730.50 | $1,730.50 | $3,461.00 |
| Greater Western Water, former City West Water area | $916.20 | $916.20 | $1,832.40 |
The last column is our arithmetic. Greater Western Water says a one-lot credit may be granted for the original lot. Growth areas pay much higher rates (for example $4,006.55 each for water and sewer on a Greater Western Water greenfield lot), and some areas also have recycled water charges. Each corporation also charges its own application and plumbing fees. Your water corporation confirms the amount when it issues its consent, before the statement of compliance. Outside Melbourne, your regional water corporation sets its own charges.
Costs that are not in the total
Public open space. Planning Victoria says the public open space requirement in clause 53.01 or the Subdivision Act 1988 does not apply to a subdivision into two lots where the council considers it unlikely that each lot will be further subdivided. Three or more lots usually attract a contribution, set as a share of the land's value at the rate in the council's planning scheme: for example 5% of site value in established parts of Wyndham, 6.3% in most of Greater Dandenong's residential areas and 8.3% in most of Glen Eira. Where it applies, it is paid before the statement of compliance, and it can be a large cost.
Engineering plan checking and supervision. If your subdivision needs engineering plans, such as for drainage or a shared driveway, council can charge up to 0.75% of the estimated cost of the works to check them and up to 2.5% to supervise them (Subdivision (Fees) Regulations 2016). Not every subdivision needs engineering plans.
Melbourne Water drainage. If your land is in a Melbourne Water drainage scheme, a drainage contribution may apply. It is set per hectare by scheme and development type, and Melbourne Water confirms the amount when it sets its conditions.
Activity centre infrastructure contribution (proposed, from 2027). The Victorian Government has announced a charge of $11,350 per new dwelling or residential lot (2026-27 rate, indexed each year) in identified train and tram zone activity centres. It is due to start for planning permits issued from 1 January 2027 in 10 pilot centres (Broadmeadows, Camberwell Junction, Chadstone, Epping, Frankston, Moorabbin, Niddrie (Keilor Road), North Essendon, Preston and Ringwood) and from 1 July 2027 in 48 more. For a subdivision it would be paid before the statement of compliance. It is not in force yet and does not apply outside these centres.
Growth areas. Land brought inside Melbourne's urban growth boundary since late 2005 in the seven growth area councils can attract the state Growth Areas Infrastructure Contribution, and growth-area precincts usually carry their own development contributions. A subdivision in an established suburb normally pays neither.
Quoted work. These have no official figure and are priced on your site:
- the licensed surveyor's feature survey and plan of subdivision
- a town planner's report, if the application needs one
- specialist reports such as arborist, bushfire, flood or heritage
- civil works, driveways and stormwater
- water, sewer, power and telecommunications connections
- demolition or relocation of buildings that sit across the new boundary
- conveyancing or legal work for easements and the owners corporation, if there is common property
Rules that come first
Whether your block can be split at all depends first on its zone, the schedule to that zone and overlays such as heritage, bushfire, flood and neighbourhood character. Our guide to subdividing in Victoria walks through the state process, VicSmart and Clause 56. For three Melbourne councils in detail, see our guides to Casey, Whittlesea and Wyndham. For timeframes, see how long subdivision takes, and for how costs compare across Australia, see how much it costs to subdivide in Australia.
A licensed surveyor or town planner can confirm what your subdivision will involve and quote the work.
Frequently asked questions
How much does it cost to subdivide a block into two lots in Melbourne?
The published 2026-27 state fees for a two-lot subdivision add up to $1,607.40 through VicSmart or $2,911.30 through the regular permit process: the permit fee, certification of the plan and Land Services Victoria's registration fee. Your water corporation's new customer contributions, about $1,830 to $3,460 for water and sewer on the one new lot at 2026-27 rates, and the surveyor, engineering and works are on top of this.
What is the planning permit fee to subdivide land in Victoria in 2026-27?
For 2026-27 the fee to subdivide land into two lots is $1,537.00 (89 fee units at $17.27). A VicSmart application to subdivide is $233.10. Other subdivisions are $1,537.00 for each 100 lots created. Fees are set in fee units and change every 1 July.
Do I pay a public open space contribution on a two-lot subdivision in Victoria?
Usually not. Planning Victoria says the public open space requirement in clause 53.01 or the Subdivision Act 1988 does not apply to a subdivision into two lots where the council considers it unlikely that each lot will be further subdivided. Three or more lots usually attract a contribution at the rate in the council's planning scheme, for example 5% of site value in established parts of Wyndham, 6.3% in most of Greater Dandenong's residential areas and 8.3% in most of Glen Eira.
How much does Land Services Victoria charge to register a plan of subdivision?
From 1 July 2026, the fee to register a plan of subdivision is $723.30 plus $223.60 for each parcel, so $1,170.50 for a plan creating two lots. A further $114.80 applies for each mortgage, caveat or lease that needs a notice for consent.
What do Melbourne's water corporations charge for a new lot?
Each water corporation charges a new customer contribution for each new lot. In 2026-27 it is $1,113.63 each for water and sewer in Yarra Valley Water's standard region, $1,112.49 each in South East Water's other areas, and $1,730.50 each for infill lots in Greater Western Water's former Western Water area ($916.20 each in the former City West Water area). Growth areas pay more.
Sources
- Guide to Subdivision Act fees 2026-2027 (Land Services Victoria)
- Land Services Victoria – 2026-27 fees
- Statutory planning schedule of fees 2026-27 (Darebin City Council)
- Planning and subdivision fees (City of Casey)
- Planning Victoria – Subdivision fees
- Two homes on a lot and two lot subdivision FAQs (Planning Victoria, September 2025)
- New Customer Contributions Guide, July 2026 (Greater Western Water)
- 2026-27 Pricing Handbook (South East Water)
- New customer contributions (Yarra Valley Water)
- Applying for a subdivision (Wyndham City)
- Public open space contributions levy (Greater Dandenong)
- Subdivision (Glen Eira City Council)
- Infrastructure contributions plans for councils (Planning Victoria)
- Calculate your drainage contribution (Melbourne Water)
This guide is general information only, current at 19 November 2026. Fees and charges change, usually on 1 July. Speak to a licensed surveyor or town planner about your property.