Planning news · Western Australia

WA's Retain and Gain proposal: keep the house, add a lot

The WA Government is investigating Retain and Gain, a possible subdivision pathway that would let owners of R10 to R25 land in Perth and Peel keep their existing home and create an additional lot. It is part of the R-Codes review, it has not been approved, and comment closes on 26 February 2027.

3 min read

The WA Government is investigating a new subdivision pathway called Retain and Gain. It would give some owners in Perth and Peel more flexibility to keep their existing home and create an additional lot. Planning and Lands Minister John Carey announced it, with media reports from 12 November 2026, and the Department of Planning, Lands and Heritage has added it to its consultation on the Residential Design Codes (R-Codes) review.

It is a proposal only. It has not been approved, and comment closes on Friday 26 February 2027.

What is proposed

The department describes Retain and Gain as a potential subdivision pathway that would make it easier to keep an existing house while creating an additional lot. It says the aim is to support gentle infill, keep existing housing and reduce unnecessary demolition in established suburbs.

Under the pathway being investigated, keeping the existing dwelling would be a key eligibility requirement. The department says the idea builds on feedback about the 10% variation for retaining an existing dwelling that is already proposed in the draft R-Codes.

Media reports of the announcement describe a split into no more than two lots, where one lot meets the usual minimum for its density code and the other is at least 300 square metres. The department's published FAQs do not yet set out lot sizes, so treat those figures as reported details that could change.

Where it could apply

Where could Retain and Gain apply? The department says the investigation covers residential land coded R10, R12.5, R15, R17.5, R20 and R25 in the Perth and Peel regions. Your block's density code is set in your local council's planning scheme.

Is it in force?

Has Retain and Gain been approved? No. The department says feedback is being sought on whether the reform should proceed, how it could work, what safeguards may be needed and its likely impacts. Any future reform would need further analysis, drafting and the relevant approvals. Until then, the current R-Codes and the WA Planning Commission's existing policies apply.

Would every block qualify?

Would every eligible property be able to subdivide? No. The department says the pathway would not guarantee approval. A subdivision would still need to meet planning, design, servicing and other requirements, including minimum lot size, private open space, landscaping, site cover, access, sewer connection, and whether the retained house and the new lots are suitable. Nobody would have to subdivide, redevelop or sell.

How to have your say

Submissions on the R-Codes review close at 5.00pm (AWST) on Friday 26 February 2027 through the department's Have Your Say website. The department is also running community pop-up sessions:

  • Saturday 28 November 2026, Karrinyup, 9.00am to 12.00pm
  • Wednesday 2 December 2026, Midvale, 4.00pm to 7.00pm
  • Thursday 3 December 2026, Booragoon, 4.00pm to 6.45pm
  • Saturday 5 December 2026, Claremont, 10.00am to 1.00pm
  • Tuesday 8 December 2026, online, 11.30am to 1.00pm
  • Thursday 10 December 2026, North Perth, 4.00pm to 7.00pm

What it means if you own a block in Perth or Peel

If your home sits on R10 to R25 land, Retain and Gain is worth watching, but it does not change what you can do today. Whether a block can be split now depends on the current R-Codes minimum and average lot sizes, the position of the existing house, access to the rear, and servicing. A licensed surveyor or town planner can tell you how the current rules apply to your land.

For the wider review, see our news on the WA draft R-Codes consultation. Our guides to minimum lot sizes in WA and how to subdivide land in Western Australia explain the rules that apply now, and our guide to keeping or removing the existing house when you subdivide covers what councils check when a house is kept today.

Sources

This article is general information only and is current at 16 November 2026.

See what applies to your block.

A Subdivision Checker report works through the lot size test, constraints, approval pathway and costs for your address, with every source listed. Full report $199, or a $39 Snapshot.